A drinking-water calendar you can hand to the inspector.
Water systems run on some of the most exact schedules in public works: sampling that depends on your system type and size, reports that are due on fixed dates, and notices whose clocks start the moment a result comes back. We build that calendar for your system, keep it current, and keep the proof.
What the inspector will ask to see
- Monitoring schedule and sample-site planA written sample siting plan and collection schedule for coliform sampling. 40 CFR 141.853
- Lab results with chain of custodyMicrobiological results kept at least 5 years, chemical results at least 10 years. 40 CFR 141.33
- Consumer Confidence Report and proof of deliveryDelivered by July 1 each year, with a copy and a certification to the state. 40 CFR 141.152, 141.155
- Public notices, with delivery datesTier 1 within 24 hours, Tier 2 within 30 days, Tier 3 within one year, and a certification to the state within 10 days of each notice. 40 CFR 141.201 to 141.204, 141.31(d)
- Lead service line inventoryThe initial inventory was due October 16, 2024, and it must be publicly accessible. 40 CFR 141.84(a)
- Certified operator and licence currencyCommunity and non-transient non-community systems must have certified operators. OAC 252:631-3-18; 327 IAC 8-12
- Risk and resilience assessment and emergency response plan, where your size requires themCommunity systems serving more than 3,300 people certify both to EPA and recertify every five years. SDWA §1433
What's coming
- January 1, 2027Revised Consumer Confidence Report rules take effect. Systems serving 10,000 or more send reports twice a year. 40 CFR 141.152, 141.155(j)
- November 1, 2027Lead and Copper Rule Improvements compliance date. The lead action level drops to 0.010 mg/L, and the baseline inventory and a service line replacement plan are due. 40 CFR 141.80, 141.84. The rule is under challenge in court and remains in effect.
- April 26, 2029Compliance date for the PFAS drinking-water limits as codified. EPA has proposed, not finalized, extending PFOA and PFOS to 2031 for systems that request it and rescinding the other four PFAS limits. 40 CFR 141.61(c)(2)
How it works
Review
We go through your permits, sampling history and records and give you a written list: what's in place, what's missing, what's late.
Build the calendar
Every sample, report and notice goes on one calendar with its due date, its owner and the record that proves it was done.
Run it together
Your operators do the work and keep the authority. We keep the calendar, chase the dates, prepare the paperwork for your signature, and have the binder ready when the inspector calls.
Tell us about your system.
You stay the operator of record, and your people stay yours. We run the program and the records, and bring in qualified experts under contract when the work needs them.