Your discharge permit is your calendar.
A wastewater permit is written for your plant alone: its limits, its sampling frequencies, its reports and its expiry date. We turn it into a working schedule on day one, keep it current, and prepare the monthly reports for your signature.
What the inspector will ask to see
- Your permit, current, with every modificationEvery permit sets its own limits, monitoring frequencies and reporting. 40 CFR 122.45(d), 122.48
- Sampling records at the frequencies the permit setsEach record shows the date, place and time of sampling, who sampled, the analysis date, who analysed, the method and the result; keep at least 3 years. 40 CFR 122.41(j)
- Discharge monitoring reports, filed on timeSubmitted electronically since December 21, 2016. 40 CFR 122.41(l)(4), 127.16
- Records of exceedances, bypasses and overflows, and how they were reportedOral report within 24 hours and a written report within 5 days; other noncompliance with the next monitoring report. 40 CFR 122.41(l)(6), (l)(7)
- Certified operator coverageThe operator in responsible charge holds a certification at or above the plant's class. OAC 252:710-3-34; 327 IAC 5-23-6
- Proper operation and maintenance, including the labProper operation and maintenance at all times, including laboratory controls and quality assurance. 40 CFR 122.41(e)
- Biosolids records and annual report, where they applyMost records kept five years (some site records indefinitely); annual report February 19 where it applies. 40 CFR 503.17, 503.18
- A renewal application filed ahead of expiryApplication at least 180 days before the permit expires. 40 CFR 122.21(d)(1)
What's coming
- October 9, 2026Comments close on the proposed new definition of "waters of the United States" (a proposal, not a final rule). 91 FR 57284
- December 21, 2028Sewer overflow and bypass event reports, and general-permit reports, received by Oklahoma DEQ and IDEM must be filed electronically. 40 CFR 127.16, 127.24
How it works
Read the permit
Permits are public records. We read yours condition by condition and build the schedule before we start.
Keep the schedule
Samples, reports and renewal dates go on one calendar with owners and due dates. We track exceedances until they are closed out.
Report and be ready
We prepare the monthly reports for your signature and keep the binder assembled year-round.
The city or facility stays the permittee and the operator of record, and its operators are its own.
Papers
- WP-WW1Your permit is your calendar
Version 1.0, 25 September 2026.
- WP-WW2The campus is a small utility. In preparation.
Paper in preparation.
Tell us about your system.
You stay the operator of record, and your people stay yours. We run the program and the records, and bring in qualified experts under contract when the work needs them.